Rebar weight: mass per metre from 10M to 55M
The mass per metre of Canadian metric rebar (CSA G30.18) and how to calculate the weight of an element.
The weight of a rebar is its length multiplied by the mass per metre of its size. Here are the nominal values of Canadian metric bars (CSA G30.18).
| Bar | Diameter (mm) | Mass (kg/m) |
|---|---|---|
| 10M | 11.3 | 0.785 |
| 15M | 16.0 | 1.570 |
| 20M | 19.5 | 2.355 |
| 25M | 25.2 | 3.925 |
| 30M | 29.9 | 5.495 |
| 35M | 35.7 | 7.850 |
| 45M | 43.7 | 11.775 |
| 55M | 56.4 | 19.625 |
Calculating the weight of an element
- Straight bars: count × length × mass. Example: 12 bars 15M of 6 m = 12 × 6 × 1.570 = 113.0 kg.
- Spacing: number of bars = length to cover ÷ spacing + 1. A 9 m slab with 10M @ 300: 9,000 ÷ 300 + 1 = 31 bars.
- Stirrups: the stirrup perimeter plus the hooks, times the number of stirrups.
- Laps: add the length of each lap to the length of the bars.
Teyvor Rebar applies these calculations to each change found between two drawing sets, and attaches the details to the report.