Steel reinforcement tied in two layers, with dowels sticking up, on a construction site
TeyvorRebar
Menu

Compare your structural drawings. Get the rebar difference in minutes.

Every change found and priced, by bar size, sheet by sheet. Your first project is free.

Compare my drawings

Then a prepaid balance by card. No subscription.

ABC12720072006000F1F1F1F1F2F2GB-1GB-1GB-2GB-22S-2011PARTIAL FOUNDATION PLAN1 : 1004008004-20M CONT. TOPSTIRRUPS 10M @ 2004-20M CONT. BOT.2SECTION GB-11 : 25FOOTING SCHEDULEMARKSIZETHK.BOTTOM REINF.F11500 × 15004507-15M E.W.F22100 × 21006009-20M E.W.F31200 × 12004006-15M E.W.NOTES1. 75 MM COVER UNDER FOOTINGS.2. 15M BARS U.N.O.3. CLASS B LAP SPLICES.EXAMPLE STRUCTURES INC.STRUCTURAL ENGINEERSPROJECTSAMPLE RESIDENCE6 STOREYS, 48 UNITSTITLEFOUNDATIONS, SECTIONSAND SCHEDULESREVISIONS22026-03-12ISSUED FOR TENDER42026-09-30ISSUED FOR CONSTRUCTIONSCALEAS NOTEDDRAWNJ.T.SEALSHEETS-201REV. 411322was 4-15Mwas @ 300was 4-15M
  1. 1
    GB-1: 4-15M → 4-20MTop and bottom+96 kg
  2. 2
    F2: 1,800 → 2,1008-15M → 9-20M+41 kg
  3. 3
    Stirrups @ 300 → @ 200GB-1, over the full span+43 kg
Net difference on S-201 Example+180 kg

Two issues in. The difference out.

We compare the full drawings, not just the clouds.

  1. 1

    Upload both sets of drawings

    Tender and construction, or a directive.

  2. 2

    The agent compares the full drawings

    Sheet by sheet, dimension by dimension.

  3. 3

    The report arrives by email

    Each change, its weight, then the total.

Every bar, counted the way you would.

  1. 1
    The dimensionStirrups 10M @ 200 over 14,400
  2. 2
    The length73 stirrups of 2.30 m, so 167.9 m
  3. 3
    The mass per metre10M = 0.785 kg/m
  4. 4
    The weight167.9 m × 0.785 = 131.8 kg

GB-1, line 1: stirrup 44 of 73

14,400STIRRUPS 10M @ 200

Steel counted on GB-1

365.8kg

20M, 4 top bars143.2 kg

20M, 4 bottom bars143.2 kg

10M, stirrups79.4 kg

Comparison report, page 2 of 14

What changed, sheet by sheet

SheetChangeWeight
S-201GB-1: 4-15M → 4-20M+96 kg
S-201F2: 2,100 × 2,100, 9-20M+41 kg
S-201GB-1 stirrups: @ 300 → @ 200+43 kg
S-301Foundation wall: 15M @ 250+318 kg
S-302Level 2 slab: top bars removed−142 kg
S-410No rebar change0 kg
Net difference, 14 sheets+356 kg

Sample ResidenceExample

A report you can forward as it is.

Each line says where to look on the drawing. The calculations are attached, dimension by dimension.

Comparison report, page 2 of 14

What changed, sheet by sheet

SheetChangeWeight
S-201GB-1: 4-15M → 4-20M+96 kg
S-201F2: 2,100 × 2,100, 9-20M+41 kg
S-201GB-1 stirrups: @ 300 → @ 200+43 kg
S-301Foundation wall: 15M @ 250+318 kg
S-302Level 2 slab: top bars removed−142 kg
S-410No rebar change0 kg
Net difference, 14 sheets+356 kg

Sample ResidenceExample

Canadian or US drawings.

The agent reads each set to the standards of the project's country: bar sizes, laps, hooks and weights come from the right code.

CanadaUnited States
StandardsCSA A23.1, A23.3RSIC manualACI 318CRSI manual
Bars10M to 55MCSA G30.18#3 to #18ASTM A615, A706
Weights and lengthskg and metreslb and feet-inches
ReportIn English or French, as each user chooses

Your first project is free.

  • Then, a prepaid balanceTopped up by card. No subscription, no contract.
  • The price before you startA fixed price, known before you start.
  • Your drawings stay in CanadaKept separate by company, deleted after 24 months.
A crew at work on a concrete slab beside bundles of rebar, seen from above

Try it on your own drawings.

Your access arrives by email right away.

Your information is only used to open your trial. Privacy

Teyvor Rebar